Construction project management software

Most named checked vendor

109 of 150 valid answers named Procore

109 of 150 valid answers, 72.7% (Wilson 95% interval 65.0% to 79.2%)

Observed answers on stated dates, not a ranking. This is not a judgment of product quality.

Release 2026-09, version 2026-09.1. Method v1.1. DOI 10.5281/zenodo.22907695

Software a general contractor, home builder, remodeler or specialty subcontractor uses to run projects end to end: estimating, scheduling, budgets and job costing, RFIs and submittals, daily logs, change orders and client or subcontractor communication.

Observed answers on stated dates, not a ranking. This is not a judgment of product quality.

Capture date: 2026-09-21. The Index measures observed naming, not service quality or product merit.

Commissioned engagement: no.

Dispute policy · Explore the buyer questions

Discuss this category's evidence

Criteria Maps

Observed buyer requirements before the first vendor in source answers captured on 22 and 23 September 2026. 149 valid source answers from 150 scheduled runs. These observations are separate from the original Index release figures.

Each vendor figure uses the median across the five most named vendors in the frozen category release, including zero counts. Adjacency compares distinct source answers for the same criterion; page coverage compares criteria for the same page state. Medians are descriptive and have no confidence interval.

Prepared by the Broadcastwell team. Team review: in progress. Zero analyst verified criteria.

The AI written RFP; Study DOI 10.5281/zenodo.23271935. Source DOI 10.5281/zenodo.22907695. CC BY 4.0.

Observed source answer frequencies. Wilson intervals describe the calculation, not independent population inference. Repeated runs are not independent performance tests. Page comparisons cover only the dated page and stated scope. An unstated claim is not an absent product feature.

Any named company may request one no-cost re-run at index@broadcastwell.com; both results are published.

Checklist Audit $490. Every figure comes from the published method, v1.1.

  1. Fit with the buyer’s construction workflows

    17 of 149; 11.4%; Wilson 95% interval 7.2% to 17.5%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 3 of 3 runs; Claude, q9: 3 of 3 runs; Perplexity, q3: 3 of 3 runs; Perplexity, q8: 1 of 3 runs; Perplexity, q9: 3 of 3 runs; Google AI Overviews, q2: 1 of 3 runs; Google AI Overviews, q3: 1 of 3 runs; Google AI Overviews, q9: 1 of 3 runs; Google AI Mode, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q2|Google AI Overviews|3; construction-project-management|q3|Google AI Overviews|2; construction-project-management|q3|Perplexity|1; construction-project-management|q3|Perplexity|2; construction-project-management|q3|Perplexity|3; construction-project-management|q8|Perplexity|2; construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|ChatGPT|3; construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3; construction-project-management|q9|Google AI Mode|2; construction-project-management|q9|Google AI Overviews|3; construction-project-management|q9|Perplexity|1; construction-project-management|q9|Perplexity|2; construction-project-management|q9|Perplexity|3

    https://banamind.ai/construction-progress-tracking/construction-project-management-software: 2 source answers; https://construction.autodesk.com/workflows/construction-project-management/: 2 source answers; https://learn.g2.com/best-construction-management-software: 1 source answers; https://thedigitalprojectmanager.com/tools/best-construction-project-management-software/: 3 source answers; https://www.bluebeam.com/resources/glossary/construction-project-management-software/: 2 source answers; https://www.capterra.com/resources/project-management-software-for-construction/: 3 source answers; https://www.thecontractormatrix.com/project-job-management-software/construction-project-management-software-features: 2 source answers; No source shown: 14 source answers

  2. Mobile access for field work

    16 of 149; 10.7%; Wilson 95% interval 6.7% to 16.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 3 of 3 runs; Claude, q9: 3 of 3 runs; Perplexity, q9: 3 of 3 runs; Google AI Overviews, q9: 3 of 3 runs; Google AI Mode, q3: 1 of 3 runs; Google AI Mode, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q3|Google AI Mode|3; construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|ChatGPT|3; construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3; construction-project-management|q9|Google AI Mode|1; construction-project-management|q9|Google AI Mode|2; construction-project-management|q9|Google AI Mode|3; construction-project-management|q9|Google AI Overviews|1; construction-project-management|q9|Google AI Overviews|2; construction-project-management|q9|Google AI Overviews|3; construction-project-management|q9|Perplexity|1; construction-project-management|q9|Perplexity|2; construction-project-management|q9|Perplexity|3

    https://construction.autodesk.com/workflows/construction-project-management/: 2 source answers; https://help.autodesk.com/cloudhelp/ENU/Build-Mobile/files/Download_Project_Mobile.html?utm_source=openai: 1 source answers; https://thedigitalprojectmanager.com/tools/best-construction-project-management-software/: 3 source answers; https://www.bluebeam.com/resources/glossary/construction-project-management-software/: 2 source answers; https://www.capterra.com/resources/project-management-software-for-construction/: 3 source answers; https://www.procore.com/project-management?msockid=1bd03288879b6936085c240d868f6880&utm_source=openai: 1 source answers; https://www.sage.com/en-us/products/sage-construction-management/: 1 source answers; No source shown: 11 source answers

    • Fieldwire: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q3|Google AI Mode|3

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

    • Raken: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q3|Google AI Mode|3

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

  3. Job cost and budget tracking

    14 of 149; 9.4%; Wilson 95% interval 5.7% to 15.2%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 3 of 3 runs; Claude, q9: 3 of 3 runs; Perplexity, q9: 3 of 3 runs; Google AI Overviews, q9: 2 of 3 runs; Google AI Mode, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|ChatGPT|3; construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3; construction-project-management|q9|Google AI Mode|1; construction-project-management|q9|Google AI Mode|2; construction-project-management|q9|Google AI Mode|3; construction-project-management|q9|Google AI Overviews|2; construction-project-management|q9|Google AI Overviews|3; construction-project-management|q9|Perplexity|1; construction-project-management|q9|Perplexity|2; construction-project-management|q9|Perplexity|3

    https://banamind.ai/construction-progress-tracking/construction-project-management-software: 1 source answers; https://construction.autodesk.com/workflows/construction-project-management/: 1 source answers; https://learn.g2.com/best-construction-management-software: 3 source answers; https://thedigitalprojectmanager.com/tools/best-construction-project-management-software/: 3 source answers; https://www.bluebeam.com/resources/glossary/construction-project-management-software/: 3 source answers; https://www.capterra.com/resources/project-management-software-for-construction/: 3 source answers; https://www.procore.com/financial-management?utm_source=openai: 1 source answers; https://www.procore.com/project-management?msockid=1bd03288879b6936085c240d868f6880&utm_source=openai: 1 source answers; https://www.softwareadvice.com/construction/project-management-software-comparison/: 1 source answers; https://www.thecontractormatrix.com/project-job-management-software/construction-project-management-software-features: 1 source answers; No source shown: 9 source answers

    No adjacent vendor passage coded for this criterion.

  4. Project and task scheduling

    14 of 149; 9.4%; Wilson 95% interval 5.7% to 15.2%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 3 of 3 runs; Claude, q9: 3 of 3 runs; Perplexity, q9: 3 of 3 runs; Google AI Overviews, q9: 3 of 3 runs; Google AI Mode, q9: 2 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|ChatGPT|3; construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3; construction-project-management|q9|Google AI Mode|1; construction-project-management|q9|Google AI Mode|3; construction-project-management|q9|Google AI Overviews|1; construction-project-management|q9|Google AI Overviews|2; construction-project-management|q9|Google AI Overviews|3; construction-project-management|q9|Perplexity|1; construction-project-management|q9|Perplexity|2; construction-project-management|q9|Perplexity|3

    https://banamind.ai/construction-progress-tracking/construction-project-management-software: 1 source answers; https://construction.autodesk.com/workflows/construction-project-management/: 1 source answers; https://learn.g2.com/best-construction-management-software: 2 source answers; https://thedigitalprojectmanager.com/tools/best-construction-project-management-software/: 3 source answers; https://www.bluebeam.com/resources/glossary/construction-project-management-software/: 2 source answers; https://www.capterra.com/resources/project-management-software-for-construction/: 3 source answers; https://www.procore.com/project-management?msockid=03e264c6e35d60790a2c7288e282613d&utm_source=openai: 1 source answers; https://www.thecontractormatrix.com/project-job-management-software/construction-project-management-software-features: 2 source answers; No source shown: 10 source answers

    No adjacent vendor passage coded for this criterion.

  5. Drawing and document version control

    13 of 149; 8.7%; Wilson 95% interval 5.2% to 14.4%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 3 of 3 runs; Claude, q9: 2 of 3 runs; Perplexity, q9: 3 of 3 runs; Google AI Overviews, q9: 2 of 3 runs; Google AI Mode, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|ChatGPT|3; construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Google AI Mode|1; construction-project-management|q9|Google AI Mode|2; construction-project-management|q9|Google AI Mode|3; construction-project-management|q9|Google AI Overviews|2; construction-project-management|q9|Google AI Overviews|3; construction-project-management|q9|Perplexity|1; construction-project-management|q9|Perplexity|2; construction-project-management|q9|Perplexity|3

    https://thedigitalprojectmanager.com/tools/best-construction-project-management-software/: 3 source answers; https://www.bluebeam.com/resources/glossary/construction-project-management-software/: 2 source answers; https://www.capterra.com/resources/project-management-software-for-construction/: 3 source answers; https://www.procore.com/project-management?msockid=1bd03288879b6936085c240d868f6880&utm_source=openai: 2 source answers; https://www.thecontractormatrix.com/project-job-management-software/construction-project-management-software-features: 2 source answers; No source shown: 8 source answers

    No adjacent vendor passage coded for this criterion.

  6. Project communication and collaboration

    12 of 149; 8.1%; Wilson 95% interval 4.7% to 13.5%. Team review: in progress.

    Runs, sources and adjacent vendors

    Claude, q9: 2 of 3 runs; Perplexity, q9: 3 of 3 runs; Google AI Overviews, q9: 3 of 3 runs; Google AI Mode, q2: 1 of 3 runs; Google AI Mode, q3: 2 of 3 runs; Google AI Mode, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q2|Google AI Mode|3; construction-project-management|q3|Google AI Mode|1; construction-project-management|q3|Google AI Mode|3; construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|3; construction-project-management|q9|Google AI Mode|3; construction-project-management|q9|Google AI Overviews|1; construction-project-management|q9|Google AI Overviews|2; construction-project-management|q9|Google AI Overviews|3; construction-project-management|q9|Perplexity|1; construction-project-management|q9|Perplexity|2; construction-project-management|q9|Perplexity|3

    https://banamind.ai/construction-progress-tracking/construction-project-management-software: 1 source answers; https://construction.autodesk.com/workflows/construction-project-management/: 1 source answers; https://thedigitalprojectmanager.com/tools/best-construction-project-management-software/: 3 source answers; https://www.bluebeam.com/resources/glossary/construction-project-management-software/: 2 source answers; https://www.capterra.com/resources/project-management-software-for-construction/: 3 source answers; https://www.sage.com/en-us/products/sage-construction-management/: 2 source answers; https://www.thecontractormatrix.com/project-job-management-software/construction-project-management-software-features: 1 source answers; https://www.zoho.com/projects/construction-project-management.html: 2 source answers; No source shown: 9 source answers

    • Fieldwire: 2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q2|Google AI Mode|3; construction-project-management|q3|Google AI Mode|1

      No source shown: 2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Category median 0 of 149; 0.0%

    • Procore: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q3|Google AI Mode|3

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

  7. Project document storage and management

    11 of 149; 7.4%; Wilson 95% interval 4.2% to 12.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 1 of 3 runs; Claude, q9: 3 of 3 runs; Perplexity, q9: 3 of 3 runs; Google AI Overviews, q9: 2 of 3 runs; Google AI Mode, q9: 2 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3; construction-project-management|q9|Google AI Mode|1; construction-project-management|q9|Google AI Mode|2; construction-project-management|q9|Google AI Overviews|1; construction-project-management|q9|Google AI Overviews|3; construction-project-management|q9|Perplexity|1; construction-project-management|q9|Perplexity|2; construction-project-management|q9|Perplexity|3

    https://banamind.ai/construction-progress-tracking/construction-project-management-software: 1 source answers; https://construction.autodesk.com/workflows/construction-project-management/: 1 source answers; https://thedigitalprojectmanager.com/tools/best-construction-project-management-software/: 3 source answers; https://www.bluebeam.com/resources/glossary/construction-project-management-software/: 3 source answers; https://www.capterra.com/resources/project-management-software-for-construction/: 3 source answers; https://www.procore.com/project-management?msockid=1bd03288879b6936085c240d868f6880&utm_source=openai: 1 source answers; https://www.thecontractormatrix.com/project-job-management-software/construction-project-management-software-features: 2 source answers; No source shown: 7 source answers

    No adjacent vendor passage coded for this criterion.

  8. Cost forecasting

    10 of 149; 6.7%; Wilson 95% interval 3.7% to 11.9%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 3 of 3 runs; Claude, q9: 3 of 3 runs; Perplexity, q9: 3 of 3 runs; Google AI Mode, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|ChatGPT|3; construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3; construction-project-management|q9|Google AI Mode|2; construction-project-management|q9|Perplexity|1; construction-project-management|q9|Perplexity|2; construction-project-management|q9|Perplexity|3

    https://construction.autodesk.com/workflows/construction-project-management/: 1 source answers; https://learn.g2.com/best-construction-management-software: 3 source answers; https://thedigitalprojectmanager.com/tools/best-construction-project-management-software/: 3 source answers; https://www.bluebeam.com/resources/glossary/construction-project-management-software/: 3 source answers; https://www.procore.com/financial-management?utm_source=openai: 1 source answers; https://www.procore.com/project-management?msockid=1bd03288879b6936085c240d868f6880&utm_source=openai: 1 source answers; https://www.softwareadvice.com/construction/project-management-software-comparison/: 1 source answers; No source shown: 5 source answers

    No adjacent vendor passage coded for this criterion.

  9. Construction workflow tracking for RFIs, submittals and field reports

    9 of 149; 6.0%; Wilson 95% interval 3.2% to 11.1%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 3 of 3 runs; Perplexity, q9: 2 of 3 runs; Google AI Overviews, q9: 1 of 3 runs; Google AI Mode, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|ChatGPT|3; construction-project-management|q9|Google AI Mode|1; construction-project-management|q9|Google AI Mode|2; construction-project-management|q9|Google AI Mode|3; construction-project-management|q9|Google AI Overviews|2; construction-project-management|q9|Perplexity|1; construction-project-management|q9|Perplexity|3

    https://banamind.ai/construction-progress-tracking/construction-project-management-software: 1 source answers; https://construction.autodesk.com/workflows/construction-project-management/: 2 source answers; https://help.autodesk.com/cloudhelp/ENG/Build-About/files/What_is_Build.html?utm_source=openai: 1 source answers; https://help.autodesk.com/cloudhelp/ENU/Build-Mobile/files/Download_Project_Mobile.html?utm_source=openai: 1 source answers; https://learn.g2.com/best-construction-management-software: 1 source answers; https://thedigitalprojectmanager.com/tools/best-construction-project-management-software/: 2 source answers; https://www.bluebeam.com/resources/glossary/construction-project-management-software/: 1 source answers; https://www.capterra.com/resources/project-management-software-for-construction/: 1 source answers; https://www.procore.com/project-management/rfis?utm_source=openai: 1 source answers; https://www.procore.com/project-management?msockid=1bd03288879b6936085c240d868f6880&utm_source=openai: 2 source answers; https://www.sage.com/en-us/products/sage-construction-management/: 1 source answers; https://www.thecontractormatrix.com/project-job-management-software/construction-project-management-software-features: 2 source answers; No source shown: 4 source answers

    No adjacent vendor passage coded for this criterion.

  10. Total cost including implementation and related charges

    9 of 149; 6.0%; Wilson 95% interval 3.2% to 11.1%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 3 of 3 runs; Claude, q9: 3 of 3 runs; Perplexity, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|ChatGPT|3; construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3; construction-project-management|q9|Perplexity|1; construction-project-management|q9|Perplexity|2; construction-project-management|q9|Perplexity|3

    https://banamind.ai/construction-progress-tracking/construction-project-management-software: 3 source answers; No source shown: 6 source answers

    No adjacent vendor passage coded for this criterion.

  11. Audit and activity history

    8 of 149; 5.4%; Wilson 95% interval 2.7% to 10.2%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 3 of 3 runs; Claude, q9: 2 of 3 runs; Perplexity, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|ChatGPT|3; construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Perplexity|1; construction-project-management|q9|Perplexity|2; construction-project-management|q9|Perplexity|3

    https://help.autodesk.com/cloudhelp/ENG/Build-About/files/What_is_Build.html?utm_source=openai: 1 source answers; https://thedigitalprojectmanager.com/tools/best-construction-project-management-software/: 2 source answers; https://www.bluebeam.com/resources/glossary/construction-project-management-software/: 1 source answers; https://www.capterra.com/resources/project-management-software-for-construction/: 2 source answers; https://www.procore.com/project-management/rfis?utm_source=openai: 1 source answers; https://www.procore.com/project-management?msockid=1bd03288879b6936085c240d868f6880&utm_source=openai: 1 source answers; https://www.thecontractormatrix.com/project-job-management-software/construction-project-management-software-features: 3 source answers; https://www.zoho.com/projects/construction-project-management.html: 1 source answers; No source shown: 2 source answers

    No adjacent vendor passage coded for this criterion.

  12. Change order tracking

    8 of 149; 5.4%; Wilson 95% interval 2.7% to 10.2%. Team review: in progress.

    Runs, sources and adjacent vendors

    Claude, q9: 2 of 3 runs; Google AI Overviews, q9: 2 of 3 runs; Google AI Mode, q3: 2 of 3 runs; Google AI Mode, q9: 2 of 3 runs

    Deposited source answers construction-project-management|q3|Google AI Mode|1; construction-project-management|q3|Google AI Mode|3; construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Google AI Mode|2; construction-project-management|q9|Google AI Mode|3; construction-project-management|q9|Google AI Overviews|1; construction-project-management|q9|Google AI Overviews|2

    No source shown: 8 source answers

    No adjacent vendor passage coded for this criterion.

  13. Integration with existing accounting and project systems

    8 of 149; 5.4%; Wilson 95% interval 2.7% to 10.2%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 3 of 3 runs; Perplexity, q9: 3 of 3 runs; Google AI Overviews, q9: 2 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|ChatGPT|3; construction-project-management|q9|Google AI Overviews|1; construction-project-management|q9|Google AI Overviews|2; construction-project-management|q9|Perplexity|1; construction-project-management|q9|Perplexity|2; construction-project-management|q9|Perplexity|3

    https://banamind.ai/construction-progress-tracking/construction-project-management-software: 1 source answers; https://construction.autodesk.com/?utm_source=openai: 2 source answers; https://construction.autodesk.com/partners/integrate-with-autodesk-construction-cloud/?utm_source=openai: 1 source answers; https://learn.g2.com/best-construction-management-software: 3 source answers; https://www.bluebeam.com/resources/glossary/construction-project-management-software/: 3 source answers; https://www.capterra.com/resources/project-management-software-for-construction/: 3 source answers; https://www.procore.com/financial-management?utm_source=openai: 1 source answers; https://www.procore.com/project-management?msockid=03e264c6e35d60790a2c7288e282613d&utm_source=openai: 1 source answers; https://www.thecontractormatrix.com/project-job-management-software/construction-project-management-software-features: 1 source answers; No source shown: 2 source answers

    No adjacent vendor passage coded for this criterion.

  14. An interface field staff can use easily

    7 of 149; 4.7%; Wilson 95% interval 2.3% to 9.4%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 2 of 3 runs; Perplexity, q9: 1 of 3 runs; Google AI Overviews, q9: 1 of 3 runs; Google AI Mode, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|3; construction-project-management|q9|Google AI Mode|1; construction-project-management|q9|Google AI Mode|2; construction-project-management|q9|Google AI Mode|3; construction-project-management|q9|Google AI Overviews|2; construction-project-management|q9|Perplexity|1

    https://construction.autodesk.com/workflows/construction-project-management/: 1 source answers; https://thedigitalprojectmanager.com/tools/best-construction-project-management-software/: 1 source answers; No source shown: 6 source answers

    No adjacent vendor passage coded for this criterion.

  15. Change order tracking and approval

    6 of 149; 4.0%; Wilson 95% interval 1.9% to 8.5%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 3 of 3 runs; Perplexity, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|ChatGPT|3; construction-project-management|q9|Perplexity|1; construction-project-management|q9|Perplexity|2; construction-project-management|q9|Perplexity|3

    https://banamind.ai/construction-progress-tracking/construction-project-management-software: 1 source answers; https://construction.autodesk.com/workflows/construction-project-management/: 3 source answers; https://thedigitalprojectmanager.com/tools/best-construction-project-management-software/: 3 source answers; https://www.bluebeam.com/resources/glossary/construction-project-management-software/: 3 source answers; https://www.capterra.com/resources/project-management-software-for-construction/: 3 source answers; https://www.procore.com/financial-management?utm_source=openai: 1 source answers; https://www.procore.com/project-management?msockid=1bd03288879b6936085c240d868f6880&utm_source=openai: 1 source answers; https://www.softwareadvice.com/construction/project-management-software-comparison/: 3 source answers; https://www.thecontractormatrix.com/project-job-management-software/construction-project-management-software-features: 1 source answers; No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  16. Implementation and onboarding support

    6 of 149; 4.0%; Wilson 95% interval 1.9% to 8.5%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 2 of 3 runs; Claude, q9: 3 of 3 runs; Google AI Overviews, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|3; construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3; construction-project-management|q9|Google AI Overviews|1

    No source shown: 6 source answers

    No adjacent vendor passage coded for this criterion.

  17. Clear pricing basis and included features

    5 of 149; 3.4%; Wilson 95% interval 1.4% to 7.6%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 2 of 3 runs; Claude, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3

    No source shown: 5 source answers

    No adjacent vendor passage coded for this criterion.

  18. Offline access for field work

    5 of 149; 3.4%; Wilson 95% interval 1.4% to 7.6%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Overviews, q9: 2 of 3 runs; Google AI Mode, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|Google AI Mode|1; construction-project-management|q9|Google AI Mode|2; construction-project-management|q9|Google AI Mode|3; construction-project-management|q9|Google AI Overviews|1; construction-project-management|q9|Google AI Overviews|2

    No source shown: 5 source answers

    No adjacent vendor passage coded for this criterion.

  19. Project dashboards and reporting

    5 of 149; 3.4%; Wilson 95% interval 1.4% to 7.6%. Team review: in progress.

    Runs, sources and adjacent vendors

    Perplexity, q9: 3 of 3 runs; Google AI Mode, q9: 2 of 3 runs

    Deposited source answers construction-project-management|q9|Google AI Mode|1; construction-project-management|q9|Google AI Mode|3; construction-project-management|q9|Perplexity|1; construction-project-management|q9|Perplexity|2; construction-project-management|q9|Perplexity|3

    https://thedigitalprojectmanager.com/tools/best-construction-project-management-software/: 3 source answers; https://www.bluebeam.com/resources/glossary/construction-project-management-software/: 3 source answers; https://www.capterra.com/resources/project-management-software-for-construction/: 3 source answers; No source shown: 2 source answers

    No adjacent vendor passage coded for this criterion.

  20. Project document control

    5 of 149; 3.4%; Wilson 95% interval 1.4% to 7.6%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 2 of 3 runs; Google AI Overviews, q9: 1 of 3 runs; Google AI Mode, q2: 1 of 3 runs; Google AI Mode, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q2|Google AI Mode|3; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|ChatGPT|3; construction-project-management|q9|Google AI Mode|3; construction-project-management|q9|Google AI Overviews|2

    https://www.procore.com/project-management?msockid=1bd03288879b6936085c240d868f6880&utm_source=openai: 2 source answers; No source shown: 3 source answers

    • Procore: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q2|Google AI Mode|3

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

  21. Training and learning resources

    5 of 149; 3.4%; Wilson 95% interval 1.4% to 7.6%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 1 of 3 runs; Claude, q9: 3 of 3 runs; Google AI Overviews, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|3; construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3; construction-project-management|q9|Google AI Overviews|1

    No source shown: 5 source answers

    No adjacent vendor passage coded for this criterion.

  22. An easy to use interface

    4 of 149; 2.7%; Wilson 95% interval 1.0% to 6.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Claude, q9: 3 of 3 runs; Google AI Overviews, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3; construction-project-management|q9|Google AI Overviews|3

    No source shown: 4 source answers

    No adjacent vendor passage coded for this criterion.

  23. Capacity for growing project volumes

    4 of 149; 2.7%; Wilson 95% interval 1.0% to 6.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Claude, q9: 3 of 3 runs; Perplexity, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3; construction-project-management|q9|Perplexity|3

    https://construction.autodesk.com/workflows/construction-project-management/: 1 source answers; https://www.capterra.com/resources/key-construction-management-software-features/: 1 source answers; No source shown: 3 source answers

    No adjacent vendor passage coded for this criterion.

  24. Change order handling

    4 of 149; 2.7%; Wilson 95% interval 1.0% to 6.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Mode, q2: 2 of 3 runs; Google AI Mode, q3: 1 of 3 runs; Google AI Mode, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q2|Google AI Mode|1; construction-project-management|q2|Google AI Mode|2; construction-project-management|q3|Google AI Mode|2; construction-project-management|q9|Google AI Mode|1

    No source shown: 4 source answers

    • Knowify: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q3|Google AI Mode|2

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

    • Procore: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q2|Google AI Mode|1

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

  25. Field progress tracking

    4 of 149; 2.7%; Wilson 95% interval 1.0% to 6.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Claude, q9: 3 of 3 runs; Google AI Overviews, q3: 1 of 3 runs

    Deposited source answers construction-project-management|q3|Google AI Overviews|2; construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3

    No source shown: 4 source answers

    • Fieldwire: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q3|Google AI Overviews|2

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

  26. Integration with the buyer’s existing software

    4 of 149; 2.7%; Wilson 95% interval 1.0% to 6.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Claude, q9: 3 of 3 runs; Google AI Overviews, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3; construction-project-management|q9|Google AI Overviews|3

    No source shown: 4 source answers

    No adjacent vendor passage coded for this criterion.

  27. No cost evaluation access for fit and usability

    3 of 149; 2.0%; Wilson 95% interval 0.7% to 5.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Claude, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3

    No source shown: 3 source answers

    No adjacent vendor passage coded for this criterion.

  28. Access to customer support

    3 of 149; 2.0%; Wilson 95% interval 0.7% to 5.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Claude, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3

    No source shown: 3 source answers

    No adjacent vendor passage coded for this criterion.

  29. An interface field and office staff can use easily

    3 of 149; 2.0%; Wilson 95% interval 0.7% to 5.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 1 of 3 runs; Google AI Overviews, q9: 1 of 3 runs; Google AI Mode, q2: 1 of 3 runs

    Deposited source answers construction-project-management|q2|Google AI Mode|2; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|Google AI Overviews|1

    https://help.autodesk.com/cloudhelp/ENU/Build-Mobile/files/Download_Project_Mobile.html?utm_source=openai: 1 source answers; No source shown: 2 source answers

    • Fieldwire: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q2|Google AI Mode|2

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

  30. Assigned approvals, reminders and responsibility

    3 of 149; 2.0%; Wilson 95% interval 0.7% to 5.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|ChatGPT|3

    https://help.autodesk.com/cloudhelp/ENG/Build-About/files/What_is_Build.html?utm_source=openai: 1 source answers; https://www.procore.com/project-management/rfis?utm_source=openai: 1 source answers; https://www.procore.com/project-management?msockid=1bd03288879b6936085c240d868f6880&utm_source=openai: 1 source answers

    No adjacent vendor passage coded for this criterion.

  31. Complete project data export

    3 of 149; 2.0%; Wilson 95% interval 0.7% to 5.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|ChatGPT|3

    No source shown: 3 source answers

    No adjacent vendor passage coded for this criterion.

  32. Demonstrated performance on a representative project

    3 of 149; 2.0%; Wilson 95% interval 0.7% to 5.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|ChatGPT|3

    No source shown: 3 source answers

    No adjacent vendor passage coded for this criterion.

  33. Deployment model suited to remote access and site conditions

    3 of 149; 2.0%; Wilson 95% interval 0.7% to 5.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Claude, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3

    No source shown: 3 source answers

    No adjacent vendor passage coded for this criterion.

  34. Experience in the buyer’s construction segment

    3 of 149; 2.0%; Wilson 95% interval 0.7% to 5.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Claude, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3

    No source shown: 3 source answers

    No adjacent vendor passage coded for this criterion.

  35. Integration with existing accounting or ERP software

    3 of 149; 2.0%; Wilson 95% interval 0.7% to 5.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Mode, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|Google AI Mode|1; construction-project-management|q9|Google AI Mode|2; construction-project-management|q9|Google AI Mode|3

    No source shown: 3 source answers

    No adjacent vendor passage coded for this criterion.

  36. Multifactor authentication

    3 of 149; 2.0%; Wilson 95% interval 0.7% to 5.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|ChatGPT|3

    No source shown: 3 source answers

    No adjacent vendor passage coded for this criterion.

  37. Offline access and synchronization

    3 of 149; 2.0%; Wilson 95% interval 0.7% to 5.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2; construction-project-management|q9|ChatGPT|3

    https://help.autodesk.com/cloudhelp/ENU/Build-Mobile/files/Download_Project_Mobile.html?utm_source=openai: 2 source answers; https://www.procore.com/project-management?msockid=1bd03288879b6936085c240d868f6880&utm_source=openai: 1 source answers

    No adjacent vendor passage coded for this criterion.

  38. Required compliance documentation and reporting

    3 of 149; 2.0%; Wilson 95% interval 0.7% to 5.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Claude, q9: 3 of 3 runs

    Deposited source answers construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2; construction-project-management|q9|Claude|3

    No source shown: 3 source answers

    No adjacent vendor passage coded for this criterion.

  39. Role based access for project participants

    3 of 149; 2.0%; Wilson 95% interval 0.7% to 5.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 2 of 3 runs; Perplexity, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|3; construction-project-management|q9|Perplexity|2

    https://learn.g2.com/best-construction-management-software: 1 source answers; https://old.construction.autodesk.com/tools/construction-team-and-user-permissions/?utm_source=openai: 1 source answers; https://thedigitalprojectmanager.com/tools/best-construction-project-management-software/: 1 source answers; https://www.capterra.com/resources/project-management-software-for-construction/: 1 source answers; https://www.thecontractormatrix.com/project-job-management-software/construction-project-management-software-features: 1 source answers; No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  40. AIA billing

    2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Mode, q2: 1 of 3 runs; Google AI Mode, q3: 1 of 3 runs

    Deposited source answers construction-project-management|q2|Google AI Mode|2; construction-project-management|q3|Google AI Mode|2

    No source shown: 2 source answers

    • Knowify: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q3|Google AI Mode|2

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

  41. Access permissions

    2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 1 of 3 runs; Perplexity, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|2; construction-project-management|q9|Perplexity|3

    https://thedigitalprojectmanager.com/tools/best-construction-project-management-software/: 1 source answers; https://www.bluebeam.com/resources/glossary/construction-project-management-software/: 1 source answers; https://www.capterra.com/resources/project-management-software-for-construction/: 1 source answers; https://www.thecontractormatrix.com/project-job-management-software/construction-project-management-software-features: 1 source answers; https://www.zoho.com/projects/construction-project-management.html: 1 source answers; No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  42. Approval workflows

    2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Claude, q9: 2 of 3 runs

    Deposited source answers construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|3

    No source shown: 2 source answers

    No adjacent vendor passage coded for this criterion.

  43. Clear licensing basis and external user costs

    2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Overviews, q9: 2 of 3 runs

    Deposited source answers construction-project-management|q9|Google AI Overviews|1; construction-project-management|q9|Google AI Overviews|2

    No source shown: 2 source answers

    No adjacent vendor passage coded for this criterion.

  44. Clear renewal and cancellation terms

    2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 2 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2

    No source shown: 2 source answers

    No adjacent vendor passage coded for this criterion.

  45. Client communication portals

    2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Claude, q9: 1 of 3 runs; Google AI Overviews, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Claude|3; construction-project-management|q9|Google AI Overviews|3

    No source shown: 2 source answers

    • Buildertrend: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q9|Google AI Overviews|3

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

    • CoConstruct: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q9|Google AI Overviews|3

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

  46. Cost appropriate to the buyer’s scale

    2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Mode, q2: 2 of 3 runs

    Deposited source answers construction-project-management|q2|Google AI Mode|1; construction-project-management|q2|Google AI Mode|3

    No source shown: 2 source answers

    • Contractor Foreman: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q2|Google AI Mode|3

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

  47. Data backups

    2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 2 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|2

    No source shown: 2 source answers

    No adjacent vendor passage coded for this criterion.

  48. Defined synchronization direction, records and error handling

    2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 2 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1; construction-project-management|q9|ChatGPT|3

    No source shown: 2 source answers

    No adjacent vendor passage coded for this criterion.

  49. Evidence of successful adoption in other projects

    2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Claude, q9: 1 of 3 runs; Google AI Overviews, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Claude|2; construction-project-management|q9|Google AI Overviews|1

    No source shown: 2 source answers

    No adjacent vendor passage coded for this criterion.

  50. Field time tracking

    2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Mode, q3: 1 of 3 runs; Google AI Mode, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q3|Google AI Mode|2; construction-project-management|q9|Google AI Mode|2

    No source shown: 2 source answers

    • Contractor Foreman: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q3|Google AI Mode|2

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

  51. Job costing

    2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Overviews, q3: 1 of 3 runs; Google AI Mode, q3: 1 of 3 runs

    Deposited source answers construction-project-management|q3|Google AI Mode|2; construction-project-management|q3|Google AI Overviews|2

    No source shown: 2 source answers

    • JobTread: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q3|Google AI Mode|2

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

    • Knowify: 2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q3|Google AI Mode|2; construction-project-management|q3|Google AI Overviews|2

      No source shown: 2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Category median 0 of 149; 0.0%

  52. Labor, equipment and material allocation

    2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Perplexity, q9: 2 of 3 runs

    Deposited source answers construction-project-management|q9|Perplexity|1; construction-project-management|q9|Perplexity|3

    https://banamind.ai/construction-progress-tracking/construction-project-management-software: 1 source answers; https://construction.autodesk.com/workflows/construction-project-management/: 1 source answers; https://learn.g2.com/best-construction-management-software: 2 source answers; https://thedigitalprojectmanager.com/tools/best-construction-project-management-software/: 2 source answers; https://www.bluebeam.com/resources/glossary/construction-project-management-software/: 1 source answers; https://www.capterra.com/resources/project-management-software-for-construction/: 2 source answers; https://www.thecontractormatrix.com/project-job-management-software/construction-project-management-software-features: 1 source answers; https://www.zoho.com/projects/construction-project-management.html: 1 source answers

    No adjacent vendor passage coded for this criterion.

  53. Secure document storage

    2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Claude, q9: 2 of 3 runs

    Deposited source answers construction-project-management|q9|Claude|1; construction-project-management|q9|Claude|2

    No source shown: 2 source answers

    No adjacent vendor passage coded for this criterion.

  54. Setup without excessive administrative overhead

    2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Mode, q2: 2 of 3 runs

    Deposited source answers construction-project-management|q2|Google AI Mode|2; construction-project-management|q2|Google AI Mode|3

    No source shown: 2 source answers

    • Fieldwire: 2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q2|Google AI Mode|2; construction-project-management|q2|Google AI Mode|3

      No source shown: 2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Category median 0 of 149; 0.0%

  55. Subcontract management

    2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Mode, q2: 2 of 3 runs

    Deposited source answers construction-project-management|q2|Google AI Mode|1; construction-project-management|q2|Google AI Mode|2

    No source shown: 2 source answers

    • Procore: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q2|Google AI Mode|2

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

  56. Subcontractor insurance and lien waiver tracking

    2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Mode, q9: 2 of 3 runs

    Deposited source answers construction-project-management|q9|Google AI Mode|2; construction-project-management|q9|Google AI Mode|3

    No source shown: 2 source answers

    No adjacent vendor passage coded for this criterion.

  57. Workflow automation

    2 of 149; 1.3%; Wilson 95% interval 0.4% to 4.8%. Team review: in progress.

    Runs, sources and adjacent vendors

    Perplexity, q9: 2 of 3 runs

    Deposited source answers construction-project-management|q9|Perplexity|1; construction-project-management|q9|Perplexity|2

    https://learn.g2.com/best-construction-management-software: 2 source answers; https://www.bluebeam.com/resources/glossary/construction-project-management-software/: 2 source answers; https://www.capterra.com/resources/project-management-software-for-construction/: 2 source answers; https://www.thecontractormatrix.com/project-job-management-software/construction-project-management-software-features: 1 source answers

    No adjacent vendor passage coded for this criterion.

  58. Access limited appropriately for subcontractors and clients

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Perplexity, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Perplexity|1

    https://www.bluebeam.com/resources/glossary/construction-project-management-software/: 1 source answers; https://www.sage.com/en-us/products/sage-construction-management/: 1 source answers; https://www.thecontractormatrix.com/project-job-management-software/construction-project-management-software-features: 1 source answers

    No adjacent vendor passage coded for this criterion.

  59. Backup and recovery

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|3

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  60. Bid invitation distribution

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Mode, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Google AI Mode|3

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  61. Billing

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Mode, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Google AI Mode|3

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  62. Capacity for growing projects, crews and locations

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Perplexity, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Perplexity|2

    https://construction.autodesk.com/workflows/construction-project-management/: 1 source answers; https://www.capterra.com/resources/key-construction-management-software-features/: 1 source answers

    No adjacent vendor passage coded for this criterion.

  63. Capacity for larger teams and more complex projects

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Overviews, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Google AI Overviews|2

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  64. Capacity for multiple simultaneous projects

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Perplexity, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Perplexity|1

    https://construction.autodesk.com/workflows/construction-project-management/: 1 source answers; https://www.capterra.com/resources/key-construction-management-software-features/: 1 source answers

    No adjacent vendor passage coded for this criterion.

  65. Clear pricing as project volumes grow

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|3

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  66. Customer support during working hours

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|3

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  67. Daily field reports

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Overviews, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Google AI Overviews|3

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  68. Data access after cancellation

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  69. Data access and retention after cancellation

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|3

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  70. Defined synchronization records, direction and frequency

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|2

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  71. Drawing markup linked to issues and RFIs

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  72. Drawing markups linked to issues or RFIs

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|2

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  73. Drawing viewing and markup

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Overviews, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Google AI Overviews|1

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  74. Equipment and crew scheduling and dispatch

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Mode, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Google AI Mode|2

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  75. Estimating and takeoff tools

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Mode, q3: 1 of 3 runs

    Deposited source answers construction-project-management|q3|Google AI Mode|3

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  76. Estimating tools

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Mode, q3: 1 of 3 runs

    Deposited source answers construction-project-management|q3|Google AI Mode|1

    No source shown: 1 source answers

    • Procore: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q3|Google AI Mode|1

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

  77. Financial visibility

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Mode, q2: 1 of 3 runs

    Deposited source answers construction-project-management|q2|Google AI Mode|3

    No source shown: 1 source answers

    • Procore: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q2|Google AI Mode|3

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

  78. Labor, equipment and material tracking

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Perplexity, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Perplexity|2

    https://learn.g2.com/best-construction-management-software: 1 source answers; https://thedigitalprojectmanager.com/tools/best-construction-project-management-software/: 1 source answers; https://www.capterra.com/resources/project-management-software-for-construction/: 1 source answers; https://www.zoho.com/projects/construction-project-management.html: 1 source answers

    No adjacent vendor passage coded for this criterion.

  79. Margin and labor cost control

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Mode, q3: 1 of 3 runs

    Deposited source answers construction-project-management|q3|Google AI Mode|1

    No source shown: 1 source answers

    • eSUB: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q3|Google AI Mode|1

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

  80. Progress billing and retainage

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  81. Purchase order and subcontract management

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  82. Purchase order tracking

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Mode, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Google AI Mode|2

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  83. RFI and daily report workflows

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Perplexity, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Perplexity|2

    https://banamind.ai/construction-progress-tracking/construction-project-management-software: 1 source answers; https://construction.autodesk.com/workflows/construction-project-management/: 1 source answers; https://www.bluebeam.com/resources/glossary/construction-project-management-software/: 1 source answers

    No adjacent vendor passage coded for this criterion.

  84. RFI and submittal tracking

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Overviews, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Google AI Overviews|1

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  85. RFI handling

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Mode, q2: 1 of 3 runs

    Deposited source answers construction-project-management|q2|Google AI Mode|1

    No source shown: 1 source answers

    • Procore: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%.
      Vendor source evidence

      Deposited source answers construction-project-management|q2|Google AI Mode|1

      No source shown: 1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Category median 0 of 149; 0.0%

  86. Responsive customer support

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Overviews, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Google AI Overviews|1

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  87. Security documentation

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|3

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  88. Security incident response

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    ChatGPT, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|ChatGPT|1

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  89. Support from people who understand construction

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Overviews, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Google AI Overviews|1

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

  90. Two way integration with accounting software

    1 of 149; 0.7%; Wilson 95% interval 0.1% to 3.7%. Team review: in progress.

    Runs, sources and adjacent vendors

    Google AI Mode, q9: 1 of 3 runs

    Deposited source answers construction-project-management|q9|Google AI Mode|1

    No source shown: 1 source answers

    No adjacent vendor passage coded for this criterion.

Download complete category evidence · Download manifest and source hashes

Full checked set, sorted by observed counts, not a ranking.
VendorNamedVendor domain cited
Procore109 of 150 valid answers, 72.7% (Wilson 95% interval 65.0% to 79.2%)30 of 150 valid answers, 20.0% (Wilson 95% interval 14.4% to 27.1%)
Buildertrend83 of 150 valid answers, 55.3% (Wilson 95% interval 47.3% to 63.1%)34 of 150 valid answers, 22.7% (Wilson 95% interval 16.7% to 30.0%)
Contractor Foreman77 of 150 valid answers, 51.3% (Wilson 95% interval 43.4% to 59.2%)31 of 150 valid answers, 20.7% (Wilson 95% interval 15.0% to 27.8%)
Fieldwire57 of 150 valid answers, 38.0% (Wilson 95% interval 30.6% to 46.0%)37 of 150 valid answers, 24.7% (Wilson 95% interval 18.5% to 32.1%)
JobTread50 of 150 valid answers, 33.3% (Wilson 95% interval 26.3% to 41.2%)23 of 150 valid answers, 15.3% (Wilson 95% interval 10.4% to 22.0%)
Autodesk Construction Cloud44 of 150 valid answers, 29.3% (Wilson 95% interval 22.6% to 37.1%)17 of 150 valid answers, 11.3% (Wilson 95% interval 7.2% to 17.4%)
Buildxact22 of 150 valid answers, 14.7% (Wilson 95% interval 9.9% to 21.2%)13 of 150 valid answers, 8.7% (Wilson 95% interval 5.1% to 14.3%)
Kahua22 of 150 valid answers, 14.7% (Wilson 95% interval 9.9% to 21.2%)22 of 150 valid answers, 14.7% (Wilson 95% interval 9.9% to 21.2%)
CMiC19 of 150 valid answers, 12.7% (Wilson 95% interval 8.3% to 18.9%)2 of 150 valid answers, 1.3% (Wilson 95% interval 0.4% to 4.7%)
Oracle Construction and Engineering14 of 150 valid answers, 9.3% (Wilson 95% interval 5.6% to 15.1%)5 of 150 valid answers, 3.3% (Wilson 95% interval 1.4% to 7.6%)
eSUB11 of 150 valid answers, 7.3% (Wilson 95% interval 4.1% to 12.7%)3 of 150 valid answers, 2.0% (Wilson 95% interval 0.7% to 5.7%)
Foundation Software11 of 150 valid answers, 7.3% (Wilson 95% interval 4.1% to 12.7%)0 of 150 valid answers, 0.0% (Wilson 95% interval 0.0% to 2.5%)
Trimble Viewpoint11 of 150 valid answers, 7.3% (Wilson 95% interval 4.1% to 12.7%)0 of 150 valid answers, 0.0% (Wilson 95% interval 0.0% to 2.5%)
InEight8 of 150 valid answers, 5.3% (Wilson 95% interval 2.7% to 10.2%)0 of 150 valid answers, 0.0% (Wilson 95% interval 0.0% to 2.5%)
RedTeam8 of 150 valid answers, 5.3% (Wilson 95% interval 2.7% to 10.2%)7 of 150 valid answers, 4.7% (Wilson 95% interval 2.3% to 9.3%)
Sage 300 CRE4 of 150 valid answers, 2.7% (Wilson 95% interval 1.0% to 6.7%)0 of 150 valid answers, 0.0% (Wilson 95% interval 0.0% to 2.5%)
ConstructionOnline3 of 150 valid answers, 2.0% (Wilson 95% interval 0.7% to 5.7%)0 of 150 valid answers, 0.0% (Wilson 95% interval 0.0% to 2.5%)
Raken2 of 150 valid answers, 1.3% (Wilson 95% interval 0.4% to 4.7%)1 of 150 valid answers, 0.7% (Wilson 95% interval 0.1% to 3.7%)
Jonas Construction0 of 150 valid answers, 0.0% (Wilson 95% interval 0.0% to 2.5%)0 of 150 valid answers, 0.0% (Wilson 95% interval 0.0% to 2.5%)
Leap0 of 150 valid answers, 0.0% (Wilson 95% interval 0.0% to 2.5%)0 of 150 valid answers, 0.0% (Wilson 95% interval 0.0% to 2.5%)
Linarc0 of 150 valid answers, 0.0% (Wilson 95% interval 0.0% to 2.5%)0 of 150 valid answers, 0.0% (Wilson 95% interval 0.0% to 2.5%)
Penta Software0 of 150 valid answers, 0.0% (Wilson 95% interval 0.0% to 2.5%)0 of 150 valid answers, 0.0% (Wilson 95% interval 0.0% to 2.5%)

The ten buyer questions

Each question was put to every engine 3 times on the stated dates. Counts are over valid answers to the exact question.

best construction management software for a small residential builder

Question q1. 15 valid answers. Excluded answers: 0. Type: best option.

Ask the engine yourself; answers vary by run.ChatGPTPerplexityClaude

best construction project management software for a mid sized general contractor

Question q2. 15 valid answers. Excluded answers: 0. Type: best option.

Ask the engine yourself; answers vary by run.ChatGPTPerplexityClaude

best construction management software for subcontractors

Question q3. 15 valid answers. Excluded answers: 0. Type: best option.

Ask the engine yourself; answers vary by run.ChatGPTPerplexityClaude

what are the best alternatives to Procore

Question q4. 15 valid answers. Excluded answers: 0. Type: alternative.

Ask the engine yourself; answers vary by run.ChatGPTPerplexityClaude

what are the best alternatives to Buildertrend

Question q5. 15 valid answers. Excluded answers: 0. Type: alternative.

Ask the engine yourself; answers vary by run.ChatGPTPerplexityClaude

what are the best alternatives to Autodesk Construction Cloud

Question q6. 15 valid answers. Excluded answers: 0. Type: alternative.

Ask the engine yourself; answers vary by run.ChatGPTPerplexityClaude

Procore vs Buildertrend, which is better for a small GC

Question q7. 15 valid answers. Excluded answers: 0. Type: buyer evaluation.

Ask the engine yourself; answers vary by run.ChatGPTPerplexityClaude

Kahua vs e-Builder for an owner running capital projects

Question q8. 15 valid answers. Excluded answers: 0. Type: buyer evaluation.

Ask the engine yourself; answers vary by run.ChatGPTPerplexityClaude

what should I look for when choosing construction project management software

Question q9. 15 valid answers. Excluded answers: 0. Type: buyer evaluation.

Ask the engine yourself; answers vary by run.ChatGPTPerplexityClaude

best construction software for a small GC that needs estimating and scheduling without Procore complexity

Question q10. 15 valid answers. Excluded answers: 0. Type: specific workflow.

Ask the engine yourself; answers vary by run.ChatGPTPerplexityClaude

Release and method

Release
2026-09, version 2026-09.1
Published
2026-09-23
Answer capture date
2026-09-22
Source capture dates
2026-09-21
Engines
ChatGPT, Claude, Perplexity, Google AI Overviews, Google AI Mode
Configuration
10 fixed target questions, 5 engines, 3 repeats. Five controls were run outside the scored base.
Method version
v1.1
Excluded answers
0 target answers excluded; exact reasons are listed. Controls were run outside the scored base.
Commissioned engagement
No commissioned engagement is declared for this category.

Exact names and listed aliases are matched without case sensitivity at word boundaries. Plain word names require a listed qualifier nearby in the same sentence or the canonical domain among cited URLs. A vendor citation counts only when that answer also names the vendor under this rule.

Verbatim answer text is retained privately with the measurement input and import audit. No answer quotations are published here.

Download and cite

Release JSON · Category CSV · DOI 10.5281/zenodo.22907695

How to cite: Broadcastwell. The Absence Index, Construction project management software, version 2026-09.1. Permanent record. CC BY 4.0 with attribution to Broadcastwell.

The Absence Report

A monthly letter on who AI names when buyers ask for software. Published observations, source links and the limits of each release.

Subscribe free

Delivered by Substack. Unsubscribe any time.

About this page

Observed answers on stated dates, not a ranking. This is not a judgment of product quality.

This public record reports the checked set, fixed questions and stated dates. Claim a vendor page, file a dispute or ask for a re-run, or read the dispute policy and log.

Read this page as JSON · Dataset and page metadata